Monthly Archives: April 2020

Home/2020/April

Coyol Free Zone Update: Life Sciences Hub

April 29th, 2020|

Coyol Free Zone is becoming a strategic partner for the companies that establish their businesses in the Park, providing them with custom-made services that guarantee their success and growth. Today more than 70% of our clients have expanded their operations. Our Engineering Team is currently leading a record number of expansions. Take a look at this [...]

Development and standards for top Life Sciences companies

April 29th, 2020|

#DesignedToInnovate Our Engineering & Projects Director, David Salas, explains how Coyol Free Zone continues to aim at constructive efficiency in the project development, the importance of having a LEED Master Site Campus, and the experience in specialized international certifications for the Life Sciences industry. https://youtu.be/w_5bIxXbG1A

13 ways the Life Sciences Industry continues to move forward in Costa Rica

April 23rd, 2020|

Costa Rica has surged as a leading nearshore location for leading multinational companies in the Life Sciences Industry. The country is first per capita and second in Latin America in volume as a medical device exporter, and the country has plans to reach $5 billion in life science exports by the end of 2020. As Coyol [...]

Building B49, to qualify for LEED Silver Certification in the category “Core & Shell”

April 23rd, 2020|

Building B49 at #CoyolFreeZone was designed by our engineering team to qualify for #LEED Silver Certification in the category “Core & Shell”. Its roof cover has been designed to reduce the thermal load inside the building, generating savings in the initial investment of the A/C equipment and in the operating expenses during the life cycle of [...]

Building B-32, an industrial warehouse for the storage of medical devices

April 23rd, 2020|

#DesignedToInnovate Our Engineering team is currently working on the expansion of Building B-32, an industrial warehouse for the storage of medical devices manufactured in #CoyolFreeZone. For this project, our team is focused on maximizing space for the positioning of racks by placing columns 164 feet apart with a minimum height of 39 feet. The roof cover [...]

Expansion of building B53 was completed

April 23rd, 2020|

5 weeks ago the construction process of the Cold Shell for the expansion of building B53 in Coyol Free Zone was completed, and the construction of the Tenant Improvements began. In the last quarter of this year, our client will receive a tailor-made turn-key building for its expansion, with an area of 100,000 sq. Ft. #DesignedToInnovate [...]

Coyol Donation: Free Zone Will Increase Diagnostic Capacity For COVID-19 In Costa Rica

April 2nd, 2020|

The Free Zone is the country’s leader in the export of medical devices. Committed to the health of the country, the Coyol Free Zone will donate an m2000 RealTime System and 5,000 diagnostic kits for the detection of COVID-19 that will support the work of the Costa Rican Institute for Research and Teaching in Nutrition and [...]

Go to Top